Skip to main content

Auto Costing Engine

Where: Estimation โ†’ Auto Costing.

Turn a saved BOM into a selling price you can defend. The engine adds sheet-metal fabrication, powder coating, internal wiring, labour and overhead on top of component cost, applies your margin โ€” and shows every step it used.

๐Ÿ“ท Screenshot spot โ€” capture this screen and save it as static/img/screenshots/estimation-costing.png, then replace this whole box with the single line:
![Auto Costing](/img/screenshots/estimation-costing.png)

Calculatingโ€‹

  1. Select the BOM.
  2. Optionally enter enclosure dimensions (e.g. 800ร—600ร—250 Lร—Wร—H mm).
  3. Set the profit margin % (default 18).
  4. Click Calculate Cost.

The breakdown shows: Component Cost โ†’ Sheet Metal Fabrication โ†’ Powder Coating โ†’ Internal Wiring โ†’ Labour โ†’ Overhead โ†’ Total Manufacturing Cost โ†’ Profit โ†’ Selling Price, plus a numbered Calculation Trace of every step.

Dimensions = free and deterministic

With enclosure dimensions supplied, the whole calculation is deterministic and uses no AI credits. Leave them blank and the AI estimates wiring and labour from the BOM (~100 credits) โ€” the result carries an AI caveat note.

Good to knowโ€‹

  • This page is a calculator โ€” it doesn't save results to the BOM or create a quotation. To persist pricing, use the BOM Generator's Charges & Margin block; those values flow into quotations.
  • Default margin here is 18%; the Quote Studio agent defaults to 25% โ€” set the hint explicitly if it matters.