Skip to main content

AI Credits & Limits

Two independent limits govern AI usage — worth understanding both:

  1. Credits — your company's monthly AI budget.
  2. Rate limits — how fast any one user can fire AI requests.

📷 Screenshot spot — capture this screen and save it as static/img/screenshots/ai-credits.png, then replace this whole box with the single line:
![AI Credits & Limits](/img/screenshots/ai-credits.png)

Credits

Every AI call is metered by what it actually consumed — a one-word chat costs far less than a two-page analysis. The charge reflects:

  • a small fixed fee per feature (heavier features have higher fees and minimums),
  • the size of the request and the answer (tokens, including images for vision features),
  • tool work (each tool call in a chat turn adds a little),
  • compute time, and a small multiplier for structured/vision output.

Roughly, features rank by cost per call: Photo/Drawing analysis (most expensive) → BOM generationPrice OCR / Invoice ReaderChatagent sweeps (cheap — one batched call covers up to ~25 items) → GST Q&A (compute/validation itself is pure math and free; only Ask-AI costs credits).

The honest-metering rules

  • Reserve → finalize → refund. A conservative estimate is reserved before the call; the exact charge is computed from real usage afterwards. Failed calls are refunded.
  • Transparency. Every call stores its full breakdown, visible in your usage history.
  • Out of credits? You'll see: "AI credit limit reached (X/Y). Buy a credit top-up or upgrade your plan on the Subscription page." Background jobs (OCR, Invoice Reader) check at submission, so you find out immediately. You're never locked out of an agent — top-ups are always available.

Rate limits

Per user, sliding-window. If you go too fast you'll get a friendly "You're making AI requests too quickly — please wait Ns" message. Typical limits:

FeaturePer minute
Chat assistant20
Photo / drawing / BOM analysis8
Price OCR / Invoice Reader / Quote Studio6
Agent sweeps (Collections, Follow-up, Procurement, Planner, GST)10
Everything combined (global per user)40

Tracking your usage

  • Per feature, inline — the Photo Analyzer sidebar, BOM draft cards, GST answers and the Daily Briefing footer all show credits used.
  • Company-wide — the AI Usage Report (Reports page) and your subscription page show the monthly plan, credits used, credits available and the per-feature split.

Saving credits

  • Use the BOM Spec Form (free) instead of AI generation when the panel is standard.
  • Use Photo Analyzer Re-match (free) instead of Re-run AI when only the catalog or tiers changed.
  • Provide enclosure dimensions in Auto Costing to make it deterministic and free.
  • Clean text PDFs cost less than photos in OCR features.
  • Trim Daily Briefing sections to what you actually read.

For what each plan includes, see Subscription Plans.